Home 网站主页
New Home  中国2005 年5月-6月奇妙旅行
(click on any picture or link  to enlarge or for more info 点击图片扩大     

We built a new ~2500 sq' post-and-beam home on a five acre parcel in Ballston Lake in New York. Driveway construction started in early May '05 and the foundation finished in early November. The home was designed by Timberworks Design  and it is being constructed by Rustic Structures LLC from Salem, NY.  We finally moved into our new home the day before Thanksgiving 2007.     

front Jul09.jpg (258287 bytes)

Here is a beautiful day July 2009



winter 2008 frt.jpg (256002 bytes) 
Lisa and Daddy Xie during a winter storm in 2008
GF new home banner.jpg (214178 bytes)
Lisa next to a Chinese banner wishing us good luck in our new home

    

kitchen2.jpg (110664 bytes)

Jimmy and Papa Xie working on the kitchen counter. We built our own granite countertop.
kitchen w GF.jpg (115674 bytes)

This is a staged picture of GF pretending to be working

porch light.jpg (81213 bytes)

Chandelier in the front porch

 misc 1722x.jpg (100439 bytes)

Guofang holding up a shovel
misc 1727x.jpg (155855 bytes)

Jimmy and Papa Xie putting in our new split rail fence at the head of the driveway

 

misc 1716x.jpg (121344 bytes)
Jimmy trying to figure out the plumbing mess he started

misc 1714x.jpg (148752 bytes)


Radiant heat circulators...yikes!

misc 1621x.jpg (116716 bytes)
Looking up from  the great 
room to the loft

 misc 1641x.jpg (153941 bytes)
Some of the detail inside

misc 1619x.jpg (139765 bytes)

Jimmy trenching for the gas, electric and cable TV

 


misc 1744x.jpg (112458 bytes)
Guofang is really helping in this picture. She is drilling the balcony spindles for Jimmy and Papa Xie to mount
misc 1739x.jpg (130160 bytes)

We are starting to put down the balcony deck over 20' in the air!

misc 1742x.jpg (136044 bytes)
Jimmy and Papa Xie finishing the rear
balcony

 misc 1741x.jpg (140988 bytes)

still working on that darn balcony!


 

frt hse Mar07.jpg (243337 bytes)

New windows finished, new door installed and the deck is getting a high-tech Trex surface
frt hse1 Mar07.jpg (236495 bytes)

Another beautiful day at our new home site

GF glass wall.jpg (203075 bytes)

Lisa finishing her own creation. This is a glass wall in the master bathroom

 bath framing.jpg (126146 bytes)

Master bathroom coming together
Jim on phone.jpg (95829 bytes)

Jim coordinating for a delivery

 

misc 1609x.jpg (130561 bytes)

This is the beautiful front porch that is finished.
misc 1516x.jpg (141546 bytes)

Front porch structure going together. On top is Leigh, bottom left is Jim K and right is our guy Rob.

misc 1515x.jpg (114675 bytes)

The second part of the front porch is being set in place.

misc 1067x.jpg (167770 bytes) 

Windows in, rood finished and work continues.
misc 1082x.jpg (167783 bytes)

Jim showing off the new imported Chinese bamboo flooring. This will be everywhere except in the bathrooms and kitchen.

 

misc 1493x.jpg (150057 bytes)

This is the view from the pond looking from the pond towards the rear of the house
siding4 28Nov06.JPG (134758 bytes)

The beautiful ivy siding is about finished

siding6 28Nov06.JPG (139719 bytes)

View looking at the master bedroom. Note the scallops at the peaks

 stairs.jpg (99510 bytes)

Beautiful handmade stairs for the basement and loft. These are made from tulip popular that GF picked out herself.
misc 1498x.jpg (160770 bytes)

Jim and Jim working on the front deck

 

misc 859.jpg (238178 bytes)

Wall framing is finally finished
misc 860.jpg (211254 bytes)

View looking into guest bedroom.

misc 861.jpg (243861 bytes)

View from the rear. The door opening on the second floor will soon have a set of French doors and a cool loft

 misc 862.jpg (245686 bytes)

View looking into the master suite.
misc 798a.jpg (136432 bytes)

Jim coming down the roof after finishing the SIP foaming.

 

misc 664.jpg (122913 bytes)

GF is rarely on a ladder but she climbed up for this photo op.

misc 709.jpg (149349 bytes)

View looking into the loft

misc 786.jpg (258228 bytes)
Inside ceiling panel FINALLY finished. We put on over 300 of these tongue and groove boards.

misc 713.jpg (161152 bytes)

This is the view looking out the (future) rear door and into the five acre forest.

 

misc 790.jpg (232631 bytes)

Roof structural insulated panels (SIP's) being installed on our frame

 

misc 726.jpg (136826 bytes)

Jim is laying out the guest bathroom walls.

misc 728.jpg (204639 bytes)

GF is rarely on a ladder but she climbed up for this photo op.

misc 689.jpg (191418 bytes)
.

 misc 663.jpg (142148 bytes)
Jim coming down from the roof (again!).
misc 795a.jpg (141534 bytes)

SIP finishing touches.

 

misc 457.jpg (146076 bytes)

Frame under construction
misc 456.jpg (147272 bytes)

Rob is looking for the next beam to be placed

misc 457.jpg (146076 bytes)

The basic structure is taking shape

 misc 459.jpg (214685 bytes)
Daddy watching Jim and Rob finishing up the frame

misc 460.jpg (221654 bytes)

finished frame May1206.jpg (191674 bytes)

Our frame is finished! WOW...What a beautiful sight.

 

tubing1.jpg (147614 bytes)

Radiant floor tubing after installation. 
Jim and Rob tubing.jpg (151202 bytes)

Thanks for your help Rob!

radiant1.jpg (117455 bytes)

Concrete being pumped into the basement and over the radiant tubing.

concrete trk1.jpg (136769 bytes) 

More concrete

deck begins.jpg (126273 bytes)

First floor decking begins

deck begins2.jpg (135451 bytes)

Beautiful sunset as the work continues

 

frame move1 22Apr.jpg (104682 bytes)

Moving timbers from Washington County (middle of nowhere!) to our home

frame move2 22Apr.jpg (138390 bytes)

Preparing to strap down the frame with the help of Kyle Kearns
 timbers3.jpg (112910 bytes)

Timbers being readied for assembly
timbers1.jpg (140431 bytes) timbers.jpg (118843 bytes)

Beams are on-site and ready for erection.

 

foundation Nov29.jpg (63785 bytes)

Lisa  with completed foundation after we exterior sealant and before backfill

foundation1 Nov29.jpg (134342 bytes)
We are just starting the perimeter drain pipe. This was a HUGE job!
fame parts.jpg (103343 bytes)

Pictures of the timber frame as it is being constructed

 fame parts1.jpg (78819 bytes)

The frame is being built fro scratch from rough sawmill lumber


fame parts2.jpg (55682 bytes)

Jim at Rustic Structures has been VERY busy. Some of these timbers are 18" thick!

 

 

 

footings.jpg (79774 bytes)

This is the stone base for our new Superior Walls foundation system
foundation1 Nov15.jpg (163677 bytes)

Incoming foundation sections
foundation2 Nov15.jpg (77052 bytes)

This huge crane will lift the sections into the hole. It was a tight fit but the crane was shoehorned onto the site no problem
foundation3 Nov15.jpg (91614 bytes)

 The first corner of the new foundation
foundation5 Nov15.jpg (82443 bytes)

Looking at the front of the foundation
foundation4 Nov15.jpg (82243 bytes)

Last section of our new foundation.

 

Jim Bobcat1 Oct05.jpg (150017 bytes)

The home footprint is visible and ready for stone
Jim Bobcat3 Oct05.jpg (147640 bytes)
Jim's favorite toy
Jim Bobcat4 Oct05.jpg (151834 bytes)

Looking down the driveway from the front of the house
Jim and Butch spreading stone.jpg (82688 bytes)

 Butch and Jim spreading stone
Jim and Butch spreading stone1.jpg (88894 bytes)

Leveling the stone
Jim and Butch spreading stone3.jpg (84009 bytes)

Nice dust cloud

 

Lisa on dozer.jpg (90939 bytes)
Lisa trying out the new machinery before that start of the basement excavation
Butch dozer.jpg (128218 bytes)

Butch starting the excavation. This is a picture looking from the driveway
Butch dozer1.jpg (136064 bytes)

Looking towards the driveway
Lisa Bobcat Oct05.jpg (114217 bytes)

 I got the Bobcat  stuck and Lisa drove it while I pulled it with my Chevy 4WD dually.
Jim Bobcat1 Oct05.jpg (150017 bytes)

This is a good picture of the layout of the house footprint. It is essentially shaped like a '+'
Jim Bobcat4 Oct05.jpg (151834 bytes)

Going down the driveway for another load of footing stone

 

Bobcat on trlr.jpg (97755 bytes)

Bring the equipment to our home site for a busy working weekend

Bobcat on trlr1.jpg (89163 bytes)


Lots of tools and stuff to take along

Jim with transit.jpg (102921 bytes)

Setting up the transit 

 

Jim with transit and John.jpg (131521 bytes)

Checking the site to ensure for evenness

 


Jim John Butch1.jpg (88035 bytes)

Jim, John and Butch checking the site to ensure we are deep enough for the new foundation

 

 

New Hse 207.jpg (92072 bytes)
Our guy Butch working his magic doing some lot clearing
New Hse 192.jpg (172952 bytes)

Collecting material from the site to build the driveway
New Hse 198.jpg (80579 bytes)

A view from the bottom of our driveway
New Hse 200.jpg (91137 bytes)


Lisa clearing trees from our new home lot
New Hse 201.jpg (86656 bytes)

Heavy wood to be used for our future fireplace

New Hse 199.jpg (76186 bytes)
Driveway leading to our new home which will be up he road on the right